Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Feb 17, 2021     Instrument panel: Side panel installation & wiring - (4.5 hours)       Category: Electrical
1. Tied up several wire harnesses under the fuel selector panel.
2. Prepped panel mount angle by painting its edge flat black. This will make sure it doesn't show at the top edge of the panel if there is a gap there.
3. Riveted left side instrument panel to the mount angle.
4. Installed both side panels, clecoing the right side panel in place temporarily.
5. Wired and plumbed all switches and controls on left side instrument panel.
6. Began wiring the right side instrument panel switches.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.